STANDARDS
OF CONDUCT
Standard
defines common terminology, offers a standardized Job Plan - while allowing
the great diversity of individual practices that have been successfully
developed - and is offered to reduce confusion to those being introduced
to VM. The Standard includes the approved Job Plan, the Body of Knowledge
as developed by the SAVE International professional Certification Board,
typical profiles of the Value Specialist and Value Manager, duties of
a Value Organization, a glossary, and an appendix of references.
APPLICABILITY
The
Value Methodology can be applied wherever cost and/or performance improvement
is desired. That improvement can be measured in terms of monetary aspects
and/or other critical factors such as productivity, quality, time, energy,
environmental impact, and durability. VM can beneficially be applied to
virtually all areas of human endeavor
The
Value Methodology is applicable to hardware, building or other construction
projects, and to "soft" areas such as manufacturing and construction
processes, health care and environment services, programming, management
systems and organization structure. The pre-study efforts for these "soft"
types of projects utilizes standard industrial engineering techniques
such as flow charting, yield analysis, and value added task analysis to
gather essential data.
For
civil, commercial and military engineering works such as buildings, highways,
factory construction, and water/sewage treatment plants, which tend to
be one time applications, VM is applied on a project to project basis.
Since these are one-time capital projects, VM must be applied as early
in the design cycle as feasible to achieve maximum benefits. Changes or
redirection of design can be accomplished without extensive redesign,
large implementation cost, and schedule impacts. Typically for large construction
projects, specific value studies are conducted during the schematic stage
and then again at the design development (up to 45%) stage. Additional
value studies may be conducted during the construction or build phase.
For
large or unique products and systems such as military electronics or specially
designed capital equipment, VM is applied during the design cycle to assure
meeting of goals and objectives. Typically a formalized value study is
performed after preliminary design approval but before release to the
build/manufacture cycle. VM may also be applied during the build/manufacture
cycle to assure that the latest materials and technology are utilized.
VM
can also be applied during planning stages, and for project/program management
control by developing function models with assigned cost and performance
parameters. If specific functions show trends toward beyond control limits,
value studies are performed to assure the function’s performance remains
within the control limits.
THE
VALUE METHODOLOGY JOB PLAN
The
Value Methodology uses a systematic Job Plan. The Job Plan outlines specific
steps to effectively analyze a product or service in order to develop
the maximum number of alternatives to achieve the product’s or service’s
required functions. Adherence to the Job Plan will better assure maximum
benefits while offering greater flexibility.
The VM Job Plan covers three major periods of activity: Pre-Study, the
Value Study, and Post-Study. All phases and steps are performed sequentially.
As a value study progresses new data and information may cause the study
team to return to earlier phases or steps within a phase on an iterative
basis. Conversely, phases or steps within phases are not skipped.
VALUE STUDY TEAM
A key to the successful application of a value study is the skills and
experience of those applying the methodology. While the methodology can,
and often is, used by individuals, for significant projects it has been
proven that a well organized team obtains the best value for effort performed.
The Team Leader performs a key role and is a significant factor in the
degree of success. The Team Leader must have thorough training in both
the Value Methodology and team facilitation. The requirements include
strong leadership, communication skills, and experience working with users/clients.
The size and composition of the team is project dependent. The members
should represent a diverse background and experience that incorporates
all the knowledge required to fully cover the issues and objectives of
the project. Typically these include cost, estimating, procurement/materials,
and those technical disciplines unique to the project such as design,
manufacturing, construction, environmental, and marketing.
It
is most advantageous for the team leader, or a team member, to implement
the approved value proposals at study completion.
Decisions
based primarily upon one technical discipline will often have significant
effects on other disciplines within the project. In addition to being
technically competent, team member selection should include individuals
who represent the range of disciplines and end users the study results
will impact. They must be individuals who generate positive attitudes
and are willing to investigate new ideas and then rationally evaluate
them. |
منهجية الهندسة القيمية
معايير منهجية القيمة تضع تعريف للمصطلاحات الشائعة وتقدم خطة عمل نموذجية
وايضاً تسمح بتعدد الممارسات الفردية التي اثبتت نجاحها وكذلك تزيل اللبس
الذي قد يحصل للذين يستخدمون الاسلوب القيمي لاول مرة. وتشمل خطة عمل معتمدة
من قبل مجلس التسجيل التابع للجمعية الدولية لمهندسي القيمة،
نطاق التطبيق
يمكن تطبيق منهج القيمية في أي مجال يتطلب تكاليف أو تحسين أداء، ويتم
قياس مدى التحسن في الجانب المالي او جوانب اخرى مثل الانتاجية، الجودة،
الوقت، الطاقة، التأثير البيئي والمتانة. بمعنى آخر يمكن تطبيق المنهج
القيمي على جميع جوانب الحياة الانسانية.
المنهج القيمي يمكن تطبيقه على الاجهزة، المباني والمشاريع الانشائية،
عمليات التصنيع، الرعاية الصحية والخدمات البيئية، البرمجة، الانظمة الادارية
والهيكل التنظيمي. وعند دراسة المشاريع ذات الجانب النظري يتطلب استخدام
بعض التقنيات الخاصة بالهندسة الصناعية لجمع المعلومات مثل مخطط سير العمليات،
تحليل القيمة المضافة والمخططات ا
لتوضيحية الاخرى.
فيما يخص المشاريع التجارية واعمال الهندسة العسكرية مثل المباني، الطرق
السريعة، انشاءات المصانع ومحطات معالجة الصرف الصحي التي تنفذ مرة واحدة،
يتم تطبيق الدراسة القيمية لكل مشروع على حدا ، ويفضل تطبيق الدراسة القيمية
في المراحل الاولية للتصميم للحصول على افضل الفوائد حيث يمكن اجراء التعديلات
على التصميم او تغيير الفكرة التصميمية باقل تكلفة ودون الحاجة الى الكثير
من اعمال اعادة التصميم او التأثير على جدول المشروع. وايضاً بالنسبة للمشاريع
الانشائية الكبيرة، تجرى دراسات قيمية معينة اثناء مرحلة الفكرة التصميمية
ومرة اخرى في مرحلة تطوير التصميم (حتى 45%). كما يمكن اجراء دراسات قيمية
اضافية اثناء مرحلة
التنفيذ.
أما فيما يخص المنتجات او الانظمة الكبيرة او الخاصة مثل الالكترونيات
العسكرية او المعدات التي تحتاج الى تصميم خاص، تطبق الدراسة القيمية اثناء
دورة التصميم للتأكد من تلبية الاهداف المرجوة. كذلك تجرى الدراسة القيمية
النموذجية بعد اعتماد مرحلة التصميم الاولية ولكن قبل البدء في عملية التصنيع
او البناء. ويمكن اجراء الدراسة القيمية اثناء دورة البناء او التصنيع
للتأكد من استخدام احدث المواد والتقنيات.
كما يمكن تطبيق الدراسة القيمية اثناء مراحل التخطيط وفي ادارة المشاريع
او البرامج وذلك عن طريق اعداد نماذج الوظيفة والتي تحدد معايير التكلفة
والاداء. وفي حالة وجود وظائف معينة خارج نطاق السيطرة، فهنا تطبق الدراسة
القيمية للتأكد من ان الاداء الوظيفي في
الحدود المطلوبة.
اعضاء الفريق
القرارت التي تختص بمجال فني واحد سوف
تؤثر بشدة على تخصصات المشروع الاخرىي، بجانب المنافسة الفنية فإن اختيار
اعضاء الفريق يجب ان يشمل الافراد الذي يمثلون مختلف التخصصات والمستخدم
النهائي الذي تؤثر على نتائج الدراسة. ويجب ان يتميز هؤلاء الافراد بقدرتهم
على طرح الافكار الايجابية والرغبة في توليد افكار جديدة ومن ثم تقييمها.
|
 |